Dolphin Fountain 2

 

                   

We then ran all the supply and return pipes from our pump, we installed
 valves  on each  supply  pipes to  be able  to regulate the water  supply.
Also we installed a filter system to keep to fountain clean

Finally we got to set the dolphin in the fountain. The next step will be to hook
up the water supply pipes to the dolphins, we will also install 8 small dolphins
around the outside of the fountain that will shoot water on the large dolphins.

We need to seal the bottom of the fountain, so while that is drying we will take
a short break. Till next time see you soon.

 

(Click Here to continue)

 

 

Back to Newsletter