|
Dolphin Fountain 2

We then ran all the supply and return pipes
from our pump, we installed
valves on each supply pipes to be able to
regulate the water supply.
Also we installed a filter system to keep to fountain clean

Finally we got to set the dolphin in the
fountain. The next step will be to hook
up the water supply pipes to the dolphins, we will also install 8 small dolphins
around the outside of the fountain that will shoot water on the large dolphins.
We need to seal the bottom of the fountain, so
while that is drying we will take
a short break. Till next time see you soon.
(Click
Here to continue)
Back
to Newsletter |